Figure 9 converter shelf input power connections – GE Industrial Solutions CPS2400U User Manual

Page 13

Advertising
background image

CPS2400U Upstream System – 19” Product Manual

CPS2400U

850028186 r04 December 2013

13

Step

Action

6.

Connect Four -48VDC branch circuits to the DC source

Notes:

1. Each feed supplies half of the shelf. A&B feeds for side 1 and A&B feeds for side 2.
2. Size each circuit to support 35 Amp List 2 Drains – 18-6AWG

2

.

3. Verify minimum loop cable length per Table 9.

4. -48V Returns (RTN) connections must be grounded.

1. Pull connector straight off of its header.
2. Strip wire 1/2 inch
3. Insert wire fully into wire entry
4. Torque screw to 16 in-lb (1.7Nm)
5. Repeat from 2 for all wires
6. Push connector straight onto its header

Figure 9 Converter Shelf Input Power Connections

7.

Close the distribution door.

Repeat from Step 2 for each Converter Shelves.

2

Reference NEC Table 310-16 for applications of not more than three conductors in a raceway and correction factors

for Ambient Temperatures over 30°C. Each installation will vary and the installer should review NEC cabling

requirements as well as local practice to ensure proper cable sizing is achieved for the local conditions.

A -48V (1-6) Input

B -48V (1-6) Input

RTN (1-6)

RTN (7-12)

A -48V (7-12) Input

B -48V (7-12) Input