Figure 10 fan shelf input power connections – GE Industrial Solutions CPS2400U User Manual
Page 14
CPS2400U Upstream System – 19” Product Manual
CPS2400U
850028186 r04 December 2013
14
Step
Action
Fan Shelves Connect Power
8.
Connect Input Power and Frame Ground
Notes:
1. Each feed supplies half of the shelf. A&B feeds for side 1 and A&B feeds for side 2.
2. Power feeds should be derived from a fuse or breaker panel using discrete cabling which is
independent from the converter shelf.
3. Fuse externally at 10 Amps.
4. Use ring lugs or alternate per local practice.
5. Returns for the A and B feeds are shared on the -48Vdc RTN.
6. The right position on the terminal block is the frame ground for the Fan Shelf.
7. Connect de-energized DC cabling (typically 16 AWG) as shown here.
8. Connect Frame Ground wire.
Figure 10 Fan Shelf Input Power Connections
Repeat from Step 8 for remaining Fan Shelves.
A Feed (-48V)
-48V RTN
B Feed (-48V)
Frame Ground
Screws
24 - 16 gauge