Page 23: Figure 22 normal leds

Advertising
background image

CPS2400U Upstream System – 19” Product Manual

CPS2400U

850028186 r04 December 2013

23

Verify Normal States

The Controller display and LEDs on Converters, shelf Alarm Cards, and Fan Shelves will illuminate when power is applied

to the system.

Step

Action

1.

System Self Check

Check for normal operation

1. Green Controller Display backlight

2. Green LEDs on each Alarm Card, each Converter, and each Fan Shelf

Every LED labeled “A”, “B”, “OK”, “FAN”, “a”, and “b”

3. No Red LEDs or displays.

Figure 22 Normal LEDs

2.

Follow the Troubleshooting section to resolve any alarm states

Verify UL Installation Compliance

Complete the final step to verify UL installation compliance.

Step

Action

1.

Test each circuit by powering an open circuit at the remote end of the wire with a QS982 output. If red lights

do not flash, there is no leakage path to ground at operating voltage. If the FLT light does not blink yellow,

there is no hard short between tip and ring.

Note: Circuit powering is usually accomplished by closing the circuit using a 5-pin protector with DC power

applied to the system.

Configure Controller

Refer to Galaxy Pulsar Edge Quick Start Guide.

Verify and edit controller parameters per site engineering instructions.
Basic Configuration:

Installation Tab:

Site ID, Site Description, System Date, System Time, and Shelf J-Code or Product Code

Network page (Settings tab, Communications group):

DHCP Client / Fixed IP Address

FTTN page (Settings tab, System group):

Alarm parameters

Complete Configuration:

Verify and edit any additional controller parameters per site engineering instructions.