CPS2400U Upstream System – 19” Product Manual

CPS2400U

850028186 r04 December 2013

20

Install Inter-Shelf Signal Cables

Each Converter Shelf Alarm Card communicates with the Fan Shelf and Controller via daisy chained cables.

Step

Action

1.

Install Inter-Shelf cables between all shelves in the system.
Note: Install RJ-45 cables as shown.

Top (P1) and Bottom (P2) connectors have different signals.

Cable from the top RJ45

3

connector of each shelf to the bottom RJ45

3

connector of the shelf above.

Figure 17 Inter-Shelf Cables

Connect Office Alarms

See Appendix C: Operation without a Controller - Alarm Wiring for systems without a controller.

Step

Action

1.

Install Controller Office Alarm Cable

4

1. Connect office alarm cable to J1 Office Alarm Connector on the Primary Fan Shelf (Fan Shelf with

Controller).

2. Dress cable out to alarm block and terminate alarms per site engineering instructions - Table 5.

Figure 18 Controller Office Alarm Connector

3

RJ45 connectors of Converter Shelves are located on their Alarm Cards.

4

Office Alarm Cable is separately ordered. For available cables see Line Power Product Line Brochure.

Inter-Shelf Cables

Install only as shown.

Top (P1) and bottom (P2)

shelf connectors have

different signals.

Inter-Shelf Cable to Bottom

Fan Shelf of Converter Shelf

Stack above, if present

Inter-Shelf Cable to Top

Converter Shelf of Converter

Shelf Stack below, if present

Converter Shelf doors not shown.

J1 Office Alarm Connector