5. Installation

Once the installation location has been planned and prepared, you are ready to install the Alpha Micro. There are

three steps to setting up the Alpha Micro:

1. Mounting the Alpha Micro.

2. Wiring the Alpha Micro.

3. Wiring the external batteries.

5.1 Tools and Equipment Required for Installation

• Tools and equipment for mounting to a wooden pole.
• Tools and equipment for mounting to a concrete pole.
• Tools and equipment for mounting to a wall.

5.2 Transporting and Lifting

WARNING!

To avoid personal injury or damage to the equipment, always use at least two installa-

tion personnel to remove the unit from its container.
Electronic modules, batteries or other components, with the exception of factory-

installed components, must not be installed until the Alpha Micro enclosure has been

securely set in place at its permanent location. Transporting the unit with batteries

installed may cause a short circuit, fire, explosion, and/or damage to the battery pack,

enclosure and installed equipment. Damage caused by improper shipping or transport-

ing a unit with batteries installed is not covered by the warranty.

CAUTION!

Enclosure must always remain in the upright position during the shipping, storage and

installation process. Damage may result from enclosure being shipped or stored on its

side.

A safe means of transportation to the site and a safe procedure for unloading the enclosure is necessary. At least

two installation personnel are required to lift and handle it. The installation team must assess the transport path

for all obstructions. An obstruction free path should be selected for transport. Use safe lifting practice at all times.