Burkert Type 8035 User Manual

Page 40

Advertising
background image

38

Installationandwiring

Insert each cable through a nut than through the cable gland, using the cable glands as shown in “Figure 27”.

Cable of the flow sensor

Cables of the relay outputs DO2 and
DO3

Power supply cable
12-36 V DC or 115/230 V AC

Cable of the digital inputs and

the DO1 and DO4 outputs

Figure 27:

Using the cable glands on a wall-mounted version

On a 115/230 V AC fed wall-mounted version, remove both terminal blocks (marked 7 and 8 in “Figure 21”)
from the housing.

Before wiring the device insert the supplied cable clips into the slots of
the electronic board and of the 115/230 V AC power supply board if
the device has such a board.

Figure 28:

Inserting the cable clips

Depending on the operating voltage of the device, wire according to chap. “7.6.7”, “7.6.9” to “7.6.12” and
“9.6”.

Insert the two terminal blocks (marked 7 and 8 in “Figure 21”) into their original position.

Letting the housing stay completely open, secure the power supply cable, the flow sensor connection cable
and the relay connection cables, with the cable clips.

Tighten the cable glands making sure the cable in the housing is long enough to allow complete opening of
the housing.

Close the cover.

Tighten the 4 screws.

Put the blanking strips on the housing.

7.6.7

Connecting the remote flow sensor to a panel-mounted or
wall-mounted version

Only move the selectors when the power supply is off.

Insert the supplied stopper gaskets into the unused cable glands to ensure the tightness of the device.

• Unscrew the unused cable gland.

• Remove the transparent disk.

• Insert the supplied stopper gasket.

• Screw the nut of the cable gland.

English

Type 8025 - 8035 BATCH

Advertising
This manual is related to the following products: