Lk series – General Pump LK Repair Manual User Manual
Page 12
Advertising
![background image](/manuals/347283/12/background.png)
GENERAL PUMP
A member of the Interpump Group
LK SERIES
Slip the internal bearing rings off the PTO shaft (pos. 1, fig. 33) and also slip off the two internal bearing
spacers (pos. 2, fig. 33).
The internal and external bearing rings must be reassembled in exactly the same order
and pairings in which they were dismantled.
Using a sufficiently long bar (pos. 1, fig. 34) and a striking hammer, take the bearing rings out of the pump
casing (pos. 1, fig. 35), along with the external spacer (pos. 1, fig. 36) and the bearing lubrication bushing
(pos. 1, fig. 37).
Page 12
Advertising