Lk series – General Pump LK Repair Manual User Manual

Page 12

Advertising
background image

GENERAL PUMP

A member of the Interpump Group

LK SERIES

Slip the internal bearing rings off the PTO shaft (pos. 1, fig. 33) and also slip off the two internal bearing

spacers (pos. 2, fig. 33).

The internal and external bearing rings must be reassembled in exactly the same order

and pairings in which they were dismantled.

Using a sufficiently long bar (pos. 1, fig. 34) and a striking hammer, take the bearing rings out of the pump

casing (pos. 1, fig. 35), along with the external spacer (pos. 1, fig. 36) and the bearing lubrication bushing

(pos. 1, fig. 37).

Page 12

Advertising