Lk series – General Pump LK Repair Manual User Manual

Page 7

Advertising
background image

GENERAL PUMP

A member of the Interpump Group

LK SERIES

Page 7

On one side, screw a ferrule (type SKF KM20) onto the pressure bushing (pos. 1, fig. 15), and then unblock

the bushing using a striking hammer (pos. 1, fig 16), but do not remove it. Repeat the operation on the other

side.

Remove the shim from under the shank of the central connecting rod.

Unscrew and take out the bushing locking flange attachment screws, from both sides (pos. 1, fig. 13). The

bushing locking flanges must be left in position (pos. 1, fig. 14).

Advertising