Lk series – General Pump LK Repair Manual User Manual
Page 18
![background image](/manuals/347283/18/background.png)
GENERAL PUMP
A member of the Interpump Group
LK SERIES
Page 18
Remove the device for locking the connecting rods (p/n F27566200) (pos. 1, fig 40) and roll back the
connecting rods until they tough the crankshaft.
Insert the pre-assembled PTO shaft into the casing (pos. 1, fig. 55). Insert it from the other side to the side
where the external bearing ring and the bearing lubrication bushing were inserted.
The PTO shaft must be inserted into the casing so that the teeth are oriented as
shown in fig. 55.
It is easier to insert the PTO shaft completely inside the bearing by applying an M16 screw to the end of the
shaft being inserted, to keep the shaft lifted up (pos. 1, fig. 56).
From the side of the casing where the PTO shaft was inserted, proceed to insert the bearing lubrication bush-
ing (pos. 1, fig. 57) and an external bearing ring (pos. 1, fig. 58) using a pad and a mallet or striking hammer.