Lk series – General Pump LK Repair Manual User Manual
Page 17
Advertising
GENERAL PUMP
A member of the Interpump Group
LK SERIES
Page 17
Pre-assemble the PTO shaft:
Onto the PTO shaft, slip on the 2 internal rings of the bearings (one per side) (pos. 1, fig. 52).
The internal and external bearing rings must be reassembled in exactly the same
order and pairings in which they were dismantled.
From one side of the casing, insert the bearing lubrication bushing (pos. 1, fig. 53) and an external bearing
ring (pos. 1, fig. 54) using a pad and a mallet or striking hammer.
The crankcase must be inserted into the casing so that the teeth on the ring bevel gears are oriented
as shown in fig. 51.
Advertising