Manual defibrillator testing, Code readiness test – ZOLL R Series Monitor Defibrillator Rev J User Manual

Page 309

Advertising
background image

Manual Defibrillator Testing

9650-0904-01 Rev. K

ZOLL R Series Operator’s Guide

13–3

Code Readiness Test

The R Series defibrillator performs Code Readiness tests automatically to verify its integrity
and readiness for emergency use. These tests verify the following:

Battery — Verifies that the battery state of charge is sufficient for at least one hour of
continuous monitoring and ten shocks at maximum energy.

Therapy Electrodes— Verifies that OneStep Pacing, CPR, or Complete electrodes are
attached to the unit, have not expired, and that the electrode gel has not dried out.

Note:

The Code Readiness system automatically verifies the integrity of the specific
electrodes listed above. Other electrodes (including members of the OneStep family)
should be verified manually for connection, condition, and expiration date.

ECG circuitry — Verifies that the ECG signal acquisition and processing electronics are
functional.

Defibrillator charge and discharge circuitry — Verifies that the defibrillator electronics are
functional and can charge and discharge at 30 joules through the patient cable and into
paddles, OneStep electrodes, or the Test Port.

Microprocessor hardware and software — Verifies the proper function of the
microprocessor electronics and the integrity of software.

CPR circuitry and sensor — Verifies that the Real CPR Help circuits are functional (when
OneStep CPR or Complete electrodes are attached).

To prepare for Code Readiness tests, do the following:

1. Connect the R Series to AC mains.

2.

Do one of the following:

Connect unopened OneStep electrodes to the OneStep cable,

(Unopened OneStep electrodes act as a test port. The test port capability no longer
functions once the electrode package is opened and electrodes are deployed.)

Connect the OneStep cable to paddles, and seat the paddles in the paddle wells,

(Verify adult paddles are installed and pushed all the way into the paddle wells.)

or

Connect the OneStep cable to the test port.

After the successful completion of the readiness check, the Code Readiness indicator displays a
green check, indicating that the unit is ready for therapeutic use. If configured, the R Series will
print a test record following automatic test completion.

The unit performs an automatic device check, if configured to do so, once per day at the
configured time. For information, refer to the R Series Configuration Guide.

Manual Defibrillator Testing

The following test performs:

Power-on sequence check.

SHOCK button and delivered energy check.

Pacer check.

Recorder check.

Advertising