Installation of panel – Metal Sales T-Armor Series User Manual

Page 52

Advertising
background image

© Metal Sales Manufacturing Corporation / Subject to change without notice 09/14

52

INSTALLATION OF PANEL (

cont

.)

12. Field-drill the first hole (using a 5/16" bit) through both panels for

9

/

32

" Bulb-Tite Rivet fasteners (see below for number of

fasteners require for each width of panel) and install first Bulb-Tite Rivet, drill second hole and install the second Bulb-

Tite Rivet, continue untill all fasteners have been installed.

13. Install

9

/

32

" Bulb-Tite Rivet with hand rivet pullas as shown on page 16 or a power rivet puller where the peak panel laps

over the eave panel and fasten in accordance with fastening pattern sequence shown below. Do not exceed 2.5" between

Rivets.

14. Repeat these steps for subsequent endlaps.

BULB-RIVET FASTENING PATTERN

SELF DRILLER FASTENING PATTERN

1

1

1

1

3

3

3

3

5

5

5

7

6

6

2

2

2

2

4

4

4

4

12" Panel Profile

12" Panel Profile

16" Panel Profile

16" Panel Profile

18" Panel Profile

18" Panel Profile

24" Panel Profile

24" Panel Profile

1

1

1

1

3

3

3

3

5

5

5

5

7

6

7

9

2

2

2

2

4

4

4

4

6

8

10

6

8

7

Advertising