T-armor, Rakewall – Metal Sales T-Armor Series User Manual

Page 64

Advertising
background image

© Metal Sales Manufacturing Corporation / Subject to change without notice 09/14

T-ARMOR

64

INSTALLATION NOTES

RAKEWALL

Floating Rake Angle and T-Armor panels must be installed

prior to Rakewall flashing installation (See pages 47-56).

1. With T-Armor panel properly nested beside Offset Rake

Slide, apply a row of Double Bead Tape Sealant across

upper side of Offset Rake Slide.

2. Fasten through Offset Rake Slide, Tape Sealant, panel

and into Floating Rake Angle with #12-14 x 1

1

/

4

" Self

Driller XL screws, 1'-0" oc.

3. Apply row of Double Bead Tape Sealant on top of Offset

Rake Slide.

4. Install Rakewall so that top of flashing is flush with top

of Offset Rake Slide and panel rib. Fasten through

Rakewall, Tape Sealant and into Offset Rake Slide with

¼"-14 x

7

/

8

" Stitch XL screws, 1'-0" oc.

5. Install Counter Flashing, Reglet or wall panel and fasten

to parapet wall with appropriate fastener, 1'-0" oc. If Counter Flashing or Reglet is used, seal to wall with

Tube Sealant. Do NOT fasten Rakewall to parapet wall.

6. If two or more flashings are required, lap the upslope flashing over the previously installed flashing by a

minimum of 2" placing a bead of Tube Sealant between the flashings and secure with Pop Rivets, 2.5" oc.

Moisture Barrier (by others)

1

/

4

"-14 x

7

/

8

" Stitch XL (1'-0" oc)

Rakewall

Starter

Double Bead Tape Sealant

T-Armor Panel

Offset Rake Slide

Floating Rake Zee

Tube Sealant

#12-14 x 1

1

/

4

" SD XL (1'-0" oc)

#14-13 Deck Screw (1'-0" oc)**

Fastener (by others)

Counter Flashing

CAUTION

**NOTE: DO NOT OVER TIGHTEN.

Fastener must be loose enough to allow for

Rake Angle to move back and forth

Metal Decking (By others)

With Reglet

With Counter

Advertising