T-armor, Peak - fixed – Metal Sales T-Armor Series User Manual

Page 67

Advertising
background image

© Metal Sales Manufacturing Corporation / Subject to change without notice 09/14

67

T-ARMOR

PEAK - FIXED

INSTALLATION NOTES

1. Install Roof Cleat and secure with #10-12x1" PH Wood

Screws spaced 1'-0" oc.

2. Install Eave Plate and fasten into place with #14-13

Deck Screws at 1'-0" oc. If more than one Eave Plate is

required then butt the ends together.

3. Place panels on the Eave Plate and apply a row of

Double Bead Tape Sealant across panel, up and over all

ribs approximately 2" to 3" from panel end.

4. Field-cut Z-Closure to fit between the panel ribs. Install

Z-Closure over Tape Sealant. Before continuing, make

sure Z-Closure placement will accommodate Peak

flashing.

5. Once Z-Closure is set in Tape Sealant, fasten through Z-Closure, Tape Sealant, T-Armor panel and into

the Eave Plate with #12-14x1" Self Driller N/W screws (see page 75 for number and location of fasteners

required).

6. Apply Double Bead Tape Sealant on top of Z-Closure and install Peak by hooking the open hem around the

Z-Closure and engaging with Roof Cleat.

7. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of

2" placing a bead of Tube Sealant between the flashings and secure with Pop Rivets, 2.5" oc.

T-Armor Panel

Clip w/ (2) #14-13 Deck Screws

Double Bead Tape Sealant

#12-14x1" SD N/W (1 per rib)

Z-Closure (see Pg 75)

#12-14x1" SD N/W (see Pg 75)

Panel Turn Up

Moisture Barrier (By others)
#10-12x1" PH Woodscrew (1'-0" oc)

#14-13 Deck Screws (1'-0" oc)
Bearing Plate

Eave Plate

Peak
Roof Cleat

1

/

2

:12 Slope

Minimum

Wood Blocking

Metal Decking (By others)

Additional #14-13 Deck

Screws may be required for

areas with large snow loads

*Panel cap not shown for clarity

9" max

Advertising