T-armor, Valley - floating – Metal Sales T-Armor Series User Manual

Page 61

Advertising
background image

© Metal Sales Manufacturing Corporation / Subject to change without notice 09/14

61

T-ARMOR

VALLEY - FLOATING

INSTALLATION NOTES

Panel Clip w/ (2) #14-13 Deck Screws
Bearing Plate

#14-13 Deck Screws (6" oc)

Valley

Offset Cleat

Tube Sealant (Between Panel Ribs)

Tube Sealant (in panel hem)

Double Bead Tape Sealant

T-Armor Panel

Valley Plate (by others)

3:12 Slope

Minimum

3" min

9" max

All Valley flashings must be installed prior to panel

installation.

1. Install new Valley flashing over top of rigid board

insulation. To hold Valley in place fasten to substrate

with fasteners at 4'-0" oc.

2. If two or more flashings are required, lap the upslope

flashing over the previously installed flashing by a

minimum of 6" placing two rows of Tube Sealant

between the flashings. Locate beads of Tube Sealant so

that it does not press out of the lap. Do not install any

fasteners through the Valley lap.

3. Apply a continuous row of Double Bead Tape Sealant across each side of the Valley flashing.

4. Install Offset Cleats on Double Bead Tape Sealant and secure with #14-13 Deck Screws at 6" oc.

5. Install the panels by hooking the hemmed edge of the panel (see page 76 for Hemming Instructions) around the

end of the Offset Cleats.

6. Apply Tube Sealant up the side and across the top of the panel ribs before installing the next panel.

Metal Decking (By others)

*Panel cap not shown for clarity

Advertising