T-armor, Endwall - floating – Metal Sales T-Armor Series User Manual

Page 73

Advertising
background image

© Metal Sales Manufacturing Corporation / Subject to change without notice 09/14

73

T-ARMOR

ENDWALL - FLOATING

INSTALLATION NOTES

1. Once panels have been installed, apply a row of Double

Bead Tape Sealant across panel, up and over all ribs

approximately 2" to 3" from panel end.

2. Field-cut Z-Closure to fit between the panel ribs, install

Z-Closure over Tape Sealant. Before continuing, make

sure Z-Closure placement will accommodate Pitch Break.

3. Once closure is set in Tape Sealant, fasten through

Z-Closure, Tape Sealant and T-Armor panel with

9/32" Bulb-Tite Rivets and one #12-14x1" Self Driller

N/W screw (see page 52 for number of fasteners required).

4. Apply a row of Double Bead Tape Sealant to the top of

the Z-Closure.

5. Install Pitch Break by hooking the open hem around the

Z-Closure, and fasten into the wall substrate with fasteners

at 1'-0" oc maximum.

6. If two or more flashings are required, lap the flashing over

the previously installed flashing by a minimum of 2" placing a bead of Tube Sealant between the flashings and

secure with Pop Rivets, 2.5" oc.

7. Install Counter Flashing, Reglet or wall panel and fasten to parapet wall with appropriate fastener, 1'-0" oc.

Seal to Counter Flashing, Reglet or parapet wall with Tube Sealant.

Tube Sealant

Fastener (by others)

Counter Flashing

Moisture Barrier (by others)

Starter

Pitch Break

Panel Turn Up

T-Armor Panel

Double Bead Tape Sealant

#12-14x1" SD N/W (1 per rib)

1

/

4

"-14 x

7

/

8

" Stitch XL (3 per panel)

Z-Closure (see Pg 75)

9

/

32

" Bulb-Tite Rivets (see Pg 52)

Clip w/ (2) #14-13 Deck Screws

Bearing Plate

1

/

2

:12 Slope

Minimum

Metal Decking (By others)

With Reglet

With Counter

12" max

*Can only be used with the

low and high clip systems

*Panel cap not shown for clarity

Advertising