Figure 15 – Rockwell Automation 1512A MV Controllers, 400A One-High Cabinet, Standard and Arc-Resistant Enclosure User Manual
Page 21
Advertising
Rockwell Automation Publication 1512A-UM100F-EN-P - May 2013
13
Installation – Standard Enclosure
Chapter 2
Figure 15 - Routing of Load Cables (Top exit shown)
Figure 16 - Load Cable Conduit Openings, Top Exit
Current
Transformer
Route Cables
through
Access Hole
ATTENTION: Ensure all barriers are replaced before re-energizing the
equipment. Failure to do so may result in electrical faults and cause damage to
equipment or serious injury to personnel.