Rockwell Automation 1512A MV Controllers, 400A One-High Cabinet, Standard and Arc-Resistant Enclosure User Manual

Page 31

Advertising
background image

Rockwell Automation Publication 1512A-UM100F-EN-P - May 2013

23

Installation – Arc-Resistant (ArcShield)

Chapter 3

4. Remove the two self-tapping screws from the low voltage panel, and swing

open the LV panel (see

Figure 27

).

Figure 27 - Removal of Access Door with Low Voltage Panel Rotated

5. Remove the 24 bolts that secure the access door to the frame – remove the

panel (see

Figure 27

).

6. Remove the two screens at the back of the low voltage compartment (see

Figure 28

).

Figure 28 - Removal of Low Voltage Barriers to Access Power Bus

Access Door

Remove bolts securing
this access door

Swing Open Low
Voltage Panel

Low Voltage Barriers

Remove four screws
from each low
voltage barrier panel

Advertising