18

▪▪▪▪▪▪▪

10.

Install a large washer, a lock washer,

and a hex nut onto each stud.

Do not tighten until all four sets of
hardware are in place.

Continue to protect the fiber optic
cable, as shown here.

11.

When all four sets of washers and nuts

are threaded on, begin tightening each
set. Do not damage or distort the
mounting frame.

If nylon-insert nuts are preferred, those
may be used in place of standard hex
nuts.

12.

When all hardware is tight, the lab

jacks may be lowered and removed.
This may be done gently, to verify that
the mountings support the weight,
and that all hardware is properly
tightened.

This photo shows the final mounting,
with all bolts installed and tightened.

As before, continue to protect the
fiber optic cable, as well as the power
and communications cables. The cart is
still shown at the bottom of this
photo, immediately after removing lab
jacks. The cables are on the bottom
shelf, ready for the next stages of
installation.