2.7 Manual operation

Metrohm 838 Advanced Sample Processor, Operation

53

2.7.9 External pump control

0

EXT

manual operation
PUMP on/off no. ?

1,

2

Switching the pump connec-

tors

The pump connectors at the rear side of the tower can be switched

with the <EXT> key. Just enter the number of the connector to

switch its state (on/off).

The state of the pump connector is displayed in the normal state of

the instrument:

******** counter 1/112

PUMP-+ STIR----- ready

The + sign stands for an activated pump connector 2.

2.7.10 Switching the injection valve

.

<

VALVE

+

manual operation
VALVE: inject

inject,

fill

Switching the injection valve

The injection valve on the tower of the 838 Advanced Sample Proc-

essors has two positions. With the <VALVE> and the <ENTER>

key the position is switched directly.

2.7.11 Rack initialization

>

*

RACK

-

******** counter 1/112

RACK busy

Initialize the sample rack

The <RACK> key immediately rotates the rack to initial position.

The magnetic rack code is read off and the corresponding rack table

is loaded. This should be done after every rack change.