ADS Environmental Services Model 4000 530017 A0 User Manual

Page 56

Advertising
background image

Monitor and Sensor Installation

3-33

10. Conform the portion of the band above the flow surface to the

pipe wall, and install an anchor bolt, nut, and washer every 12
to 24 inches (30 to 61 cm) up to the top of the band.

Completed ½-band mount in pipe

11. Run the sensor cables from the sensor location in the pipe to

the monitor location in the manhole according to the
instructions in Securing the Cables in the Pipe and Manhole on
page 3-43.

Note: If the pipe is large and the Doppler velocity sensor
and pressure depth sensor cables cannot reach the pipe
crown, attach the sensor cables to ½-inch (13-mm) PVC
tubing and anchor the tubing to the wall. This will help
prevent sensor damage during heavy flow.

Advertising