ADS Environmental Services Model 4000 530017 A0 User Manual

Page 80

Advertising
background image

Communication and Activation

4-11

10. Use 3M

TM

Linerless Rubber Splicing Tape to secure the cable

to prevent it from moving during the curing process. Wrap the
tape around the entire connector/cable assembly and about 1
inch (25 mm) up the telephone cable beyond the assembly.

Note: Support the telephone cable during the curing
process by running a cable tie between the telephone cable
and the monitor flange. Curing typically requires about 25
minutes. However, colder temperatures can extend that
time up to 2 hours.

Wiring the Telephone Cable to the Lightning
Protection Module

Next, wire the telephone cable to the lightning protection module in
the following way:

1. Open the front cover of the lighting protection module, and

remove the nuts, washers, and card from the posts inside the
module. Leave only the bottom-most nut on each post.

2. Slice a hole in the grommet in the bottom of the module, and

run the telephone cable up through the grommet into the
module.

3. Place the lugs for the following wires onto the designated

posts, and then re-place a washer and nut onto each post:

Red wire to Telco network interface

 Top left post (tip)

Green wire to Telco network interface

 Bottom left post

(ring)

Red wire from monitor

 Top right post (tip)

Green wire from monitor

 Bottom right post (ring)

Advertising