Program Run Time Report

Each program has a run time report.

Above the graph, you will see the program number

that the report is generated for. Below the graph,

you will see the date range for the report.

To display the Program Run Time

report

1. Turn the dial to the Reports position.

2. In the Select Report field, press the + button

until Run Time displays in the box. The report

displays for Program 1.

3. Perform any of the following options:

To view the report for a different program, press the Next button to highlight the

program number field, and then press the + or button to change the program number.

To view the report for a different date, press the Next button to highlight the Report

Date field, and then press the button to change the date.

Water Used

The Water Used report displays a bar chart for each flow meter

To display the Water Used report

1. Turn the dial to the Reports position.

2. In the Select Report field, press the + button until Water Used displays in the box. If you have

a flow meter installed, the report displays for that meter.

3. Perform any of the following options:

To view the report for a different flow meter, press the Next button to highlight the

serial number field, and then press the + or button to change the serial number.

To view the report for a different date, press the Next button to highlight the Report

Date field, and then press the button to change the date.