7. Press the Next button to move to the next cell in the start times grid, and then press the + or

button to set additional start times as needed.

8. After you have configured the start times for the current program, perform one of the

following actions:

To configure start times for another program, press the Enter button until the number

of the program that you want to configure displays in the Program field at the top of the

screen. Repeat steps 5 – 7.

When you have finished making changes, turn the dial to the RUN position.

To set up the start days for a program

1. Turn the dial to the Programs position.

2. Press the Next button to highlight the Program Start Days Setup option, and then press the

Enter button. The Start Days screen displays.

3. Verify that the number displayed in the

Program field matches the program that you

want to set start days for. If you want to

select a different program, press the + or

button to change the program number.

4. Press the Next button to move to the

Schedule Type field where you can select one

of the following intervals:

Days of the Week – After you select the

Days of the Week option, press the Next

button to set up the weekdays when

you want the program to start. By default, the boxes for the days of the week are

marked with a Y (Yes), which indicates that the program will start every day. If you want

to change a start day, press the Next button to select the day, and then press the + or

button to change the setting.

Interval Days – This option enables you to set up a custom interval for the program start

days. Press the Next button to move to the Watering Interval Days field, and then press

the + or button to change the setting. The next start date is calculated and entered in

the Next Start field. If you want to change the next start date, press the Previous button

to highlight the Next Start field, and then press the button to change the date.
Note: You can decrease the start date, but you cannot increase it.

Even Days – Select Even to start the program only on the even numbered days of the

month.

Odd Days – Select Odd to start the program only on the odd numbered days of the

month.

Odd Skip 31 – Select Odd Skip 31 to start the program only on the odd numbered days

of the month, but skip the 31

st

day in order to maintain an every-two-day schedule

when crossing to a new month.