Setting up a primary zone, Prerequisites, To assign a primary zone – Baseline Systems BaseStation 3200 V12 User Manual

Page 47

Advertising
background image

BaseStation 3200 Advanced Irrigation Controller Manual

Setting Up a Primary Zone

A primary zone is the zone within a scheduling group that all other linked zones are linked to.

Changing the programming on this zone will adjust the programming on all linked zones, resulting

in saved time and consistency. If you are using a biSensor, the primary zone is the zone where the

sensor is located.

Note: The primary zones of a program always run first.

Prerequisites

biCoders have been assigned to zones.

If you are using soil moisture sensors, they have been installed and detected by the

controller.

You know the number of the zone that waters the area where the sensor is installed.

To assign a primary zone

1. Turn the dial to the Zones position.

2. Verify that the number displayed in the Program field matches the program in which you

want to set up the primary zone. If the zone is enabled in multiple programs and you want to

set up the primary zone in a different program, press the + or button to change the program

number.

Note: A zone can only be a primary zone in one program.

3. Press the Next button to move to the Zone field, and then press the + or button to select

the zone that you want to assign as a primary zone.

4. Press the Next button to move to the Zone Mode field.

5. Press the + or button until Primary displays in the Zone Mode field.

Note: If you change the mode of a zone to

Primary or from Primary to another mode,

you will potentially affect the programming of

other zones. For example, a primary zone has

20 linked zones. If you change the mode of

the primary zone to linked or timed, the links

to the 20 zones will be broken.

6. Repeat steps 2 – 5 for each primary zone with

a biSensor.

7. When you have finished making changes, turn

the dial to the RUN position.

Page 41

Advertising