Assigning water sources to mainlines – Baseline Systems BaseStation 3200 V12 User Manual

Page 73

Advertising
background image

BaseStation 3200 Advanced Irrigation Controller Manual

3. Press the Enter button. The Booster Pumps

screen displays.

4. In the Decoder field, press the + button to

select the master valve decoder that you

want to set up as a booster pump.

5. Press the Next button to move to the Use As

Booster Pump field, and then press the +

button change the setting to Yes.

6. Press the Next button to move to the Select

Programs with Booster Pumps field, and

then press the + button to select the program that you want to assign the booster pump to.

7. When you have finished making changes, turn the dial to the RUN position.

Assigning Water Sources to Mainlines

The BaseStation 3200 supports 8 points of connection (water sources) and 8 mainlines. By default,

the mainlines are numbered in the controller from 1 – 8 regardless of whether your system has

more than one. All water sources are automatically assigned to mainline #1, but you can change

the settings to match your irrigation system’s watering topology. The following diagram illustrates

the model that the controller uses to manage these connections.

1. Turn the dial to the Flow position.

2. Press the Next button to highlight the Assign

Water Sources to Mainlines option.

3. Press the Enter button. The POC to Mainline

screen displays.

4. In the Point of Connection column, press the

+ or button to highlight the POC that you

want to assign to a mainline.

5. Press the Next button to move to the

Mainline column, and then press the + or

button to highlight the mainline that you

want to assign to that POC.

6. Press the Previous button to return to the Point of Connection column.

7. Repeat steps 4 - 6 until you have assigned all POCs to the corresponding mainlines.