Learning the flow by program, Managing multiple flow devices and mainlines – Baseline Systems BaseStation 3200 V12 User Manual

Page 78

Advertising
background image

BaseStation 3200 Advanced Irrigation Controller Manual

Learning the Flow by Program

1. Turn the dial to the Flow position.

2. Press the Next button to highlight the Program Learn Flow Operations option.

3. Press the Enter button. The Prog Learn Flow

screen displays.

4. In the Program column, press the + button to

move to the program that you want to

schedule a learn flow cycle for.

5. Press the Next button to move to the Status

column, and then press the + button to toggle

the setting between Pending and Not Yet.

6. Press the Next button to move to the Date

column, and then press the + button set the

learn time in 5 minute increments in the future, up to about 24 hours.

Note: At the 24 hour point the status will return to Not Yet.

7. When you have finished setting up the learn flow cycle, turn the dial to the RUN position.

IMPORTANT NOTE! The learn flow cycle does not start until you turn the dial to the RUN position.

Depending on how many zones a program has, the learn flow cycle could take more than an hour

to complete.

When the learn flow cycle begins, it will pause any running programs (on that mainline), and it will

run one zone at a time to learn its flow. The controller takes an average of multiple readings. If the

readings vary too much, the learn flow process will fail. When the learn flow cycle completes, the

values are displayed in the Zone Flow Setup screen.

Managing Multiple Flow Devices and Mainlines

With the BaseStation 3200, you can independently manage 8 mainlines separate from each other.

A mainline is defined as a primary water delivery pipe that delivers water to a specific set of zones

(valves and heads). Mainlines are considered to be different and separate if the water in one

mainline cannot be delivered to the zones of another mainline.

You can program sites with this topology so that each mainline operates independently. In this

scenario, a learn flow cycle can be running on mainline 1, while a high flow shutdown event is

occurring on mainline 2, but the other mainlines and their programs/zones will continue to operate

normally.

Page 72

Advertising