EFCO S5500 SSG User Manual

Page 11

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section II: Frame Unit Assembly & Frame Sealing

CAPTURED INTERMEDIATE HORIZONTALS

AT SSG VERTICALS

Work the sealant into the joints,

and tool the sealant smooth.

Apply a generous bead of sealant to

the ends of the horizontal mullion to

a minimum of 1” back from the face
of the horizontal glazing pocket. Seal

the void between the struts as shown

on page 9.

Note: Refer to the

tooling drawings

for the fabrication
requirements of

the horizontals.

Advertising