EFCO S5500 SSG User Manual

Page 26

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section IV: Glazing Preparation

STEP #1 PREPARE FRAME FOR GLAZING

A. Seal the frame joints at the SSG vertical and perimeter SSG horizontal intersections.

Seal the 1/4” joint at the reveal at the head and sill. The joint must be sealed from the

top all the way around to the bottom of the reveal, completely filling the joint void.

B. Tool off excess sealant from the exposed areas.

SSG SILL & SSG VERTICAL INTERSECTION

(HEAD SIMILAR)

Seal all around the

joint, filling the void

completely.

SSG SILLS

WITH REVEAL

SSG VERTICAL

MULLION

MULLION

FILLERS

1/4” FRAME

JOINT

Advertising