EFCO S5500 SSG User Manual

Page 39

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section VI: Exterior Cover & Drive-In Gasket Installation

STEP #2 (Option B) APPLY HORIZONTAL PRESSURE COVERS

D. Run a continuous bead of sealant in the reglet of the Head and Sill immediately before ap-

plying the exterior pressure cover as shown below. Do not block weeps with sealant. (See

inset below).

E. Slide on and rotate the pressure covers as shown to engage the horizontal cam. Be sure

the weep holes in the cover are facing downward. The head horizontal has a continuous

snap engagement to retain the cover. Use a block of wood and mallet or hammer to make

the snap, if necessary. Care should be taken to avoid damaging the pressure cover. Since

the covers are cut D.L.O. minus 1/8”, make sure the gap at each end of the cover is equal.

F. Tool the sealant smooth on each end of the covers. After the sealant partially cures, use a

blade to cut the excess sealant flush with the surfaces of the covers.

INTERMEDIATE

PRESSURE COVER

HEAD PRESSURE

COVER

CONTINUOUS SEALANT

BEAD

REQUIRED AT HEAD AND
SILL ONLY

INTERMEDIATE HORIZONTAL

HEAD & SILL HORIZONTAL

Advertising