EFCO S5500 SSG User Manual

Page 45

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

STEP #3 SET DOOR FRAME

A. Carefully position the door frame into opening. Extreme care should be taken to protect the

filler part of the frame during shipment and handling. Damage to the edges of the filler will

be noticeable after it is snapped into the door jamb.

B. Using blocks of wood and ‘C’ clamps, carefully snap the filler into the door jamb working

from one end to the other.

DOOR FRAME

MULLION FILLER

Section VII: Door Framing Installation & Anchorage

Advertising