EFCO S5500 SSG User Manual

Page 53

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section XI: Perimeter Caulking

STEP #1 PREPARE JOINT FOR CAULK APPLICATION

A. Perimeter caulk joint application should not begin until the curtain wall elevation has

been completely erected and glazed.

B. Clean and prime the perimeter caulk joint opening as recommended by the sealant

manufacturer’s installation instructions.

C. Use the appropriate sized backer rod for the desired caulk joint. The minimum caulk joint

size for the S-5500 is 3/4”. Recess the backer rod as shown in the installation instruc-

tions and shop drawing details.

D. Apply the sealant and tool into the joint, recessing the sealant as noted.


IMPORTANT NOTE: DO NOT BLOCK THE SYSTEM WEEP HOLES LOCATED 2” FROM EACH END

OF THE SILL PRESSURE COVERS WITH SEALANT.

EFCO recommends taping over the weep holes at the sills to avoid sealing these openings

closed. Remove the tape after the perimeter seal is tooled.

Prepare and apply the interior caulk joint per the sealant manufacturer’s instructions and

the approved shop drawings, if required.

Do not block weep

holes with sealant.

Recess backer

rod and sealant

as shown.

HEAD & SILL (JAMB SIMILAR)

Advertising