EFCO S5500 SSG User Manual

Page 28

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section IV: Glazing Preparation

STEP #3 PREPARE FRAME FOR GLAZING

A. Seal the frame joints at the SSG vertical and captured head and sill intersections. Seal

the 1/4” joint at the glazing pocket. The joint must be sealed from the top all the way

around to the bottom of the glazing pocket, completely filling the joint void.

B. Tool off excess sealant from exposed areas and in areas that would interfere with in-

stalling the horizontal pressure cover.

1/4” FRAME

JOINT

Seal all around the

joint, filling the void

completely.

CAPTURED SILL

MULLION

FILLERS

SSG EXPANSION

MULLION

Note: Joint plugs are not

used in applications where

captured horizontals are
used with SSG verticals. The

horizontals must be fabri-

cated as shown below. Refer

to the tooling drawings for

more information.

Clear any sealant that ob-

structs the reglet for pres-

sure cover engagement.

CAPTURED SILL AT SSG VERTICAL