EFCO S5500 SSG User Manual

Page 40

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section VI: Exterior Cover & Drive-In Gasket Installation

STEP #3 INSTALL DRIVE-IN GASKETS IN HORIZONTAL MULLIONS

A. Apply sealant to the vertical gaskets where they will contact the horizontal gaskets on each

end behind the pressure covers as shown below.

B. Cut the horizontal gaskets D.L.O. plus 1/2”, and insert the gasket in place starting at the

center of the D.L.O. Crowd in the excess at the ends. Install the gasket on the topside of the

intermediate horizontal first to prevent the exterior cover from shifting.

C. Seal all gasket corners, and butt the joints as indicated below. Remove any excess sealant

that remains.

D. Tool the sealant that was previously applied to the ends and sides of the covers. Remove

any excess sealant that remains.

Apply sealant to

vertical gaskets.

Seal all gasket corners by

pulling the horizontal gasket

back, sealing the ends, and
pressing the gasket back

into the vertical gasket.

Tool sealant

watertight.

INTERMEDIATE SHOWN, HEAD AND SILL SIMILAR

Advertising