EFCO S5500 SSG User Manual

Page 6

Advertising
background image

EFCO CORPORATION 6/2012 PART NO. Y554

6

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section II: Frame Unit Assembly & Frame Sealing

STEP #2 SEAL EXTERIOR REVEAL TUBES

A. Plug the ends of the exterior portion of the SSG heads and sills with backer rod. Recess

the backer rod at least 1/4” from each end of the reveal tube.

B. Apply a generous amount of sealant to cover the hollow portion of the tube as shown be-

low on each end. Apply sealant to each end of the horizontal as shown on page 7. The

sealant in both areas must be applied immediately before frame assembly.

C. After the frame is assembled, tool the sealant smooth on each end of the covers. Immedi-

ately clean excess sealant from the frame, or alternatively, after the sealant partially

cures, use a blade to cut the excess sealant flush with the surfaces of the covers. (See

page 8.)

SSG HEAD & SILL HORIZONTALS WITH

REVEAL AT SSG REVEAL JAMBS

Insert backer rod.

Apply sealant

on each end.

Note: Refer to the

tooling drawings

for the fabrication
requirements of

the horizontals.

REVEAL TUBE

Advertising