EFCO S5500 SSG User Manual

Page 8

Advertising
background image

EFCO CORPORATION 6/2012 PART NO. Y554

8

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section II: Frame Unit Assembly & Frame Sealing

Apply a generous bed of sealant

to the sides of the vertical mullion

where it comes into contact with
the head and sill.

Note: Tool the sealant smooth on each

end of the reveal tube. Immediately

clean excess sealant from the frame, or
after the sealant partially cures, use a

blade to cut the excess sealant flush

with the surfaces of the reveals.

SSG HEAD & SILL HORIZONTALS WITH REVEAL

AT SSG REVEAL JAMBS (HEAD SIMILAR)

Advertising