EFCO S5500 SSG User Manual

Page 13

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section II: Frame Unit Assembly & Frame Sealing

SSG SILL HORIZONTALS WITH REVEAL AT

SSG VERTICAL MULLIONS (HEAD SIMILAR)

Work the sealant into the joints,

and tool the sealant smooth.

Apply backer rod and

sealant to the ends of the

horizontal mullions as
shown on pages 6 and 7.

Note: Refer to the

tooling drawings

for the fabrication
requirements of

the horizontals.

Advertising