EFCO S5500 SSG User Manual

Page 23

Advertising
background image

EFCO CORPORATION 6/2012

PART NO. Y554

Series 5500 Silicone Structural Glazed Curtain Wall Installation Instructions

Section III: Typical Anchorage Methods

STEP #6 INSTALL FRAME COMPONENTS – BOLTED DEAD LOAD ANCHORS

For installations with multi-spans, follow applicable notes from Step 6. When the frame is properly

aligned and is level and plumb, match drill the slab through the anchor and install anchor bolts se-

curing the anchor to the building structure. Match drill the mullion through the set of holes in the
anchor.

NOTE: The holes must be a minimum of 1” from the back of the mullion in order to clear any steel

reinforcement located inside the system as may be required on a job specific basis.

Refer to the approved shop drawings for anchor bolt size, type, spacing, and embedment, as well

as anchor dimensions.

NOTE: For special instructions regarding wind load anchors see Step 7, page 25.

FRAME UNITS

HIGH IMPACT POLYSTYRENE

HORSESHOE SHIMS AT EACH BOLT

STEEL ANCHOR PER

SHOP DRAWINGS

TEMPORARY

ALIGNMENT

SCREW (#12 X

1” TEK SCREW)

BOLTS WITH

FLAT WASHERS

BOLTED DEAD LOAD ANCHORS

ANCHOR BOLTS

AS REQUIRED

FLAT AND SPRING

LOCK WASHERS

AND NUTS

BUILDING

STRUCTURE