Phone communication, Offsite phone operation – Interlogix Simon XT Tabletop Installation Manual User Manual

Page 70

Advertising
background image

Chapter 5:

64

Simon XT TableTop Control Panel Installation Manual

3. If the known-good sensor functions, contact UTC Fire and Security for repair

or replacement of the problem sensor.

Phone communication

Perform a communication test to check the phone communication between the
panel and the central station.

To perform a communication test, do the following:

1. Go to the Comm test option under the System tests menu.

2. Press Enter. The panel confirms that a communication test has begun. When

the communication test is complete, the panel will display Comm test is OK
within three minutes.

If the test is unsuccessful, the Status button will light and the panel will display
Comm failure within ten minutes.

If the panel displays Comm failure, do the following:

1. Check that the panel is connected to the phone jack.

2. Check the phone number programmed into the panel.

3. Perform the communication test again.

4. If the communication test fails again, check the phone connection wiring.

Offsite phone operation

Test the system from a remote phone by calling the panel and using the
commands in Table 30 below

Table 30: Phone commands

System Function

Phone command

Disarm

1

Arm doors/windows

2

Arm motion sensors

3

Arm doors/windows with no entry delay

2

– 2

Arm doors/windows and motion sensors

2

– 3

Arm doors/windows with no entry delay and
motion sensors with latchkey

2

– 2 – 3 – 3

Specific light on

*

– <unit_num>.

Advertising