9.7.1 Cascade Manual Configuration
In some applications it may be necessary to configure the

cascade system manually. To do this, the boilers should

be wired as shown in the Auto Cascade section of the

manual. Then each individual control in the cascade

must have a specific address assigned by adjusting P06

“ Cascade address” on each boiler. To start, identify

the boiler that will be the “master” boiler. Navigate to

parameter P06 “cascade address” set to “0” and press

“Select” (do NOT press and hold select). Then press and

hold select.
Repeat this process for each boiler in the cascade setting

each address to a unique number.
The last step is to adjust all of the setpoints for the

installation application as shown in the Auto cascade

section of the manual.

9.7 Cascade Auto Configuration

To operate up to 8 boilers in cascade, the boilers

must be “daisy chained” together using Modbus

terminals A, B and GND, located on the boilers

terminal block. The wiring should be completed with at

least three wire shielded cable with ground. The ground

wire should be connected to a suitable chassis ground

on one end of the daisy chain only. Wire each boilers

terminal A in series with the next boilers terminal A

until all are connected. Repeat this process for Terminal

B and GND.

To configure the control system, identify which

boiler is going to be the “master” boiler for the cascade

system and navigate to installer parameter P06,

“Cascade Address”. Set the address to “0” and press

and hold “select”. When “auto cfg” appears on the

display press “select” to start the auto configuration

process. The auto configuration process will find all

boilers connected to the “master” boiler and assign

addresses. When auto configuration is complete the

display should show “boilr #” where # is the total

number of boilers found in the cascade system.

The final steps are to set the individual setpoints

in the cascade system, which include P07 “Cascade

Setpoint”, P08 “Cascade off Hysteresis” and P09

“Cascade on hysteresis”. These variables must be set

to the appropriate values for the installation. When

setting P09 “cascade on hysteresis” the value should

NOT be less than P08 “Cascade off Hysteresis” as

P09 references the off point (P07+ P08) as the starting

point for the on hysteresis. An example of this is shown

below.
Correct settings:
P07 = 120°F
P08 = 10°F
P09 = 20°F
With these setting the modulation point is 120°F
The off point is 120°F + 10°F = 130°F
The on point is 130°F – 20°F = 110°F

Incorrect settings:
P07 = 120°F
P08 = 10°F
P09 = 5°F
With these setting the modulation point is 120°F
The off point is 120°F + 10°F = 130°F
The on point is 130°F – 5°F = 125°F
In this case the boiler is turning back on prior to

reaching the modulation point, which could lead to

short cycling.