7 mounting the power converter, 7 mounting the power converter -6 – Carrier Access Access Bank II SNMP User Manual

Page 43

Advertising
background image

4-6

9/24/01

4.7 Mounting the Power Converter

The Access Bank II - SNMP is normally shipped for US operation with a 115 Vac to -48 Vdc power
conversion cube. This cube includes both a 5-foot grounded AC power cord and a 8-foot three-posi-
tion DC power cable. The Power Converter Cube has four mounting holes for attaching the unit to a
wall or other flat surface. To mount the Power Converter Cube on a nearby wall, locate the converter
within 7 feet of the Access Bank II - SNMP front Control Panel and use screws or anchors appropri-
ate to the mounting surface. If you are wall mounting the power conversion cube on the same ¾”
thick plywood sheet as the Access Bank II - SNMP, the dimensions of the board will have to be at
least 25” by 14”. Wire tie-downs can be used to keep stray wires to a minimum, but be careful not to
damage the wiring in any way.

Figure 4-1: Wall-Mounting the Access Bank II - SNMP

Advertising