Chapter 5 Maintenance 43

43

Chapter 5 Installation of Parallel

Operation System

The parallel operation system is installed as required by the installation procedures of the single

system and this chapter.

The single devices are put parallel and connected as shown in fig. 5-1, and the difference between

the lengths of the output cables of the single devices is not more than 10m. It is recommended to use an

external bypass cabinet to facilitate maintenance and system testing.

Fig. 5-1 Typical 1+N parallel operation system

Note: when the load exceeds is the capacity of the single device, the maintenance bypass

switch CB3 must be removed.

The cables for the parallel operation provide double insulation shielding up to 30m long, the control

cables for the parallel operation must be connected with all single devices to form a closed loop, as

shown in fig.5-2.

Other power supplies

Rectifier

Charger

Inverter

Inverter

Output power supply

Load connected

Mains power input,