4.3.2. SINGLE-PHASE INSTALLATION WITH 3 LOADS TO BE CONNECTED

We start with a single-phase installation in which we want to use the excess
photovoltaic production to supply 3 non-critical loads:

• Load 1: 2000 W water pump

• Load 2: 2000 W heat pump

• Load 3: 1000 W washing machine


The goal is to activate these loads during times in which there is a production
excess, thus reducing energy costs.

This is the baseline data:

PhaseP. Inverter Consumption Setpoint Current production
L1

10000 W

4000 W

40% 4000 W (40% of the nominal)

Figure 26: Single-phase installation with 3 loads to be connected.


The CDP-G programming is shown in

Table 12

:









Loads