CIRCUTOR CDP-0 User Manual

Page 33

Advertising
background image

CDP

Instruction Manual

33

Figure 29: Single-phase installation with 3 loads to connect (Load 1, 2 and 3 Connected).

As shown in

Figure 29

, we can see that although the inverter is 10 kW the

existing radiation only allows it to produce 9 kW, so to get 10 kW of consumption
it will have to take 1 kW from the grid.

In this situation the CDP-G maintains the system without adding or removing any
loads for the amount of time configured in the “Reconnection time” variable, in
order to achieve system stability (in this case 5 minutes).

Disconnection condition:

𝑷𝑷𝑷𝑷𝑷

∑ 𝑷𝑷𝑷𝑷𝑷𝑷𝑷𝑷𝑷𝑷 𝑷𝑷𝒓𝒓𝒓𝒓 < 𝑀𝒓𝒂. 𝑷𝑷𝑷𝑷 𝑷𝑷𝑷𝑷𝑷𝑷𝒐𝒐𝑷𝑷𝑷𝑷

(

1000

10000

= 10%)  10% ≤ 50% 

this condition is met

relay 3 stays connected






Loads

Advertising
This manual is related to the following products: