Comtech EF Data Vipersat Circuit Scheduler v3.7.x ArrangeLink User Manual
Page 66
Advertising
Schedule Setup
3-24
ArrangeLink User Guide
time of a scheduled event, assigned priorities will determine whether or not
the scheduled event will supersede the ongoing event and take over the
SCPC circuit.
Click the Add Schedule button to complete the scheduling of this event and add
the event to the ArrangeLink database.
Advertising