Section 8:testing the system, Installation – Montigo RP620 User Manual

Page 31

Advertising
background image

RP620 Power Vent Indoor Gas Fireplace

Page 31

XG0777 - 122014.1

Installation

Section 8:Testing the System

„

Connect two 1/8" MPT hose barb fittings to the gas valve inlet

and outlet ports, as shown in

figure 14. Connect a 0-16" W.C.

manometer to each fitting.

„

Turn on the gas supply to the appliance.

„

Wait 3 minutes and check for any gas leaks. If you smell or

detect a gas leak, turn the gas supply off and take corrective actions.

„

Turn supply power on.

„

The LED power indicator will be illuminated.

„

Install the inner window, light tray glass, and outer window (see

appropriate sections).

„

Place the appliance in operation See the lighting instructions

on

page 37.

„

Once the appliance is operational, confirm the manifold pressure

and supply pressure are within the specified limits, see

section 5.

„

Turn lights on and confirm all lights are working.

The

RP620* Control and Power Vent System can be safely tested

prior to finishing the fireplace enclosure. This test can be done quickly

and efficiently to ensure all systems function according to the design

specifications.

Figure 21.

LED Indicators

Advertising