Installation – Montigo 30FID Traditional User Manual

Page 22

Advertising
background image

Page 22

XG00516-

150204

I-Series Indoor Gas Fireplace

Installation

22). Connect the unit to the gas and electrical supply.
23). Before concluding the conversion, make sure you leak test

the entire system and check all operational functions to ensure

that the unit is performing safely and properly.
24). Fill out required information on LP conversion label.

25). Remove rating plate from under appliance and turn it over

to the blank side.

26). Apply sticker to blank side. Put rating plate back.

19). Replace the NG Pilot orifice with the LP Pilot orifice. If you

get the orifices mixed up, the LP orifice has a grove machined

around the diameter near the end.

20). Reverse steps to install pilot hood.

21). The minimum primary air setting is different depending on fuel

and burner. The minimum primary air is set by hand-bent tabs on

the primary air adjustment. Bend the appropriate tab down for your

fuel and burner. See specifications table or primary air adjustment

for proper tab. See image below for tab lengths. If your setting is

fully closed, bend both tabs up.

1/16 "

3/16 "

Figure 19 Sec.6

Figure 20 Sec.6

Figure 21 Sec.6

Figure 22 Sec.6

Figure 23 Sec.6

Advertising
This manual is related to the following products: