Scheduling an nqa test group, Configuration prerequisites – H3C Technologies H3C WX6000 Series Access Controllers User Manual

Page 157

Advertising
background image

11-22

To do…

Use the command…

Remarks

Enter system view

system-view

Enter NQA test group view

nqa entry admin-name
operation-tag

Enter test type view of a test group

type { dhcp | dns | ftp | http |
icmp-echo | snmp | tcp |
udp-echo | udp-jitter | voice }

Configure the description for a test
group

description text

Optional

By default, no description is
available for a test group.

Configure the interval between two
consecutive tests for a test group

frequency interval

Optional

By default, the interval between
two consecutive tests for a test
group is 0 milliseconds. Only one
test is performed.

If the last test is not completed
when the interval specified by the
frequency
command is reached, a
new test does not start.

Configure the number of probe
operations to be performed in one
test

probe count times

Optional

By default, one probe operation is
performed in one test.

Not available for voice tests, Only
one probe operation can be
performed in one voice test.

Configure the NQA probe timeout
time

probe timeout timeout

Optional

By default, the timeout time is 3000
milliseconds.

Not available for UDP jitter tests.

Configure the maximum number of
hops a probe packet traverses in
the network

ttl value

Optional

20 by default.

Not available for DHCP tests.

Configure the ToS field in an IP
packet header in an NQA probe
packet

tos value

Optional

0 by default.

Not available for DHCP tests.

Enable the routing table bypass
function

route-option bypass-route

Optional

Disabled by default.

Not available for DHCP tests.

Scheduling an NQA Test Group

You can schedule an NQA test group by setting the start time and test duration for a test group.

A test group performs tests between the scheduled start time and the end time (the start time plus test

duration). If the scheduled start time is ahead of the system time, the test group starts testing

immediately. If both the scheduled start and end time are behind the system time, no test will start. To

view the current system time, use the display clock command.

Configuration prerequisites

Before you schedule an NQA test group, complete the following tasks:

Advertising