Checklist before installation – H3C Technologies H3C SecPath F5000-S Firewall User Manual

Page 16

Advertising
background image

7

Front mounting

bracket (required)

Rubber feet (required)

Bail latch (required)

Cable tie (user supplied)

Checklist before installation

Table 5 Checklist before installation

Item Requirements

Result

Installation
site

Ventilation

There is a minimum clearance of 10 cm (3.94 in) around
the inlet and outlet air vents for heat dissipation of the

firewall chassis.

A ventilation system is available at the installation site.

Temperature

Operating: 0°C to 40°C (32°F to 104°F)
Non operating: –40°C to +70°C (–40°F to +158°F)

Relative humidity

Operating: 10% to 95% (noncondensing)
Non operating: 5% to 95% (noncondensing)

Cleanness

Dust concentration ≤ 3 × 10

4

particles/m

3

No dust on desk within three days

ESD prevention

The equipment and rack are well grounded.

The equipment room is dust-proof.

The humidity and temperature are at a proper level.

Wear an ESD-preventive wrist strap and make sure the
wrist strap makes good skin contact and is well

grounded when installing FRUs.

Put cards away on an ESD-preventive workbench, with
the PCB upward, or put them in ESD-preventive bags for

future use.

Touch only the edges, instead of electronic components

when observing or moving a removed interface card.

EMI prevention

Take effective measures to protect the power system from

the power grid system.

Separate the protection ground of the firewall from the

grounding device or lightning protection grounding

device as far as possible.

Keep the firewall far away from radio stations, radar and

high-frequency devices working in high current.

Use electromagnetic shielding when necessary.