Checking the setup – Exabyte MAGNUM 1X7 LTO User Manual

Page 61

Advertising
background image

O

CTOBER

2006

M

AGNUM

1

X

7 LTO A

UTOLOADER

45

C

HECKING

THE

S

ETUP

C

HECKING

THE

S

ETUP

After configuring the autoloader, check the setup by performing the exercises

suggested below. While these exercises are not required, it is a good idea to

verify that your software and hardware are properly communicating before

you begin operation.



Import several cartridges into the autoloader, and load and unload

cartridges into the tape drive. See

page 62

for instructions. You may also

want to run a system demo. See

page 75

for instructions. These exercises

help determine whether the autoloader’s hardware components are

operating properly.



If you have not already done so, install the software application on the host

computer. Instruct the software to load and unload one or more cartridges

in the tape drive. This helps determine whether the software and autoloader

are communicating properly.



Back up several megabytes of data with the tape drive and perform a

comparison check on the backed-up data. This determines whether the

software and tape drive are communicating properly.

If the autoloader and tape drive are not operating as expected, see



Chapter 8

for troubleshooting tips



Appendix C

for error message descriptions and corrective actions

If you cannot resolve the problem yourself, contact Exabyte Technical Support

(see

page iii

).

Advertising